Email List

Search Results

The following is an archived video story. The text content of that video story is available below for reference. The original video has been deleted and is no longer available.

Resurfacing Highway 74A

Work began Friday to resurface a 2-mile section of Highway 74A near Minehole Gap, to bring added safety to a stretch of road drivers have called dangerous.

The area came to the attention of DOT engineers last year following the death of toddler who died in an accident on the highway.  Residents in the area complained the road was unsafe.  The DOT responded by lowering the speed limit to 45.  This week they began a resurfacing project.  Division Construction Engineer Rick Tipton says, "it's a rougher surface that gives drivers more traction."

The DOT says recent skid tests did not reveal any problems with the highway surface. But out of an abundance of caution they elected to apply a newer surface that should provide a safer drive. Officials say the resurfacing part of the project should be completed in a few days and won't interfere with the opening of school next week.

By Frank Fraboni
Follow Frank on Twitter @FRABONZ

 



6:00PM News 13 @ 6
6:30PM ABC World News
7:00PM Wheel of Fortune
7:30PM Jeopardy
8:00PM The Bachelor
10:00PM Castle
11:00PM News 13 Tonight

Complete Schedule »